Hit enter to search or ESC to close

4.1 Electricity

Production Offices 

Recommended
  • Production offices should source electricity under a 100% renewable tariff.

Stores and Workshops 

Recommended
  • Stores and workshops should source electricity under a 100% renewable tariff.

Unit Bases/Locations

Recommended
  • Unit bases and locations should ideally be powered from mains electricity. Where it is not possible to source power from mains electricity, the first alternative option should be to use a hybrid battery system using HVO fuel. Where a hybrid battery system is not feasible, a standard generator using HVO fuel should be used. Generators should be right-sized to match the load and data logging should be used to monitor power output.

Studios

Recommended
  • Studios should source electricity under a 100% renewable tariff.